Please use this identifier to cite or link to this item: https://repositorio.uco.edu.co/jspui/handle/20.500.13064/869
Full metadata record
DC FieldValueLanguage
dc.rights.licensehttp://creativecommons.org/licenses/by/3.0/-
dc.contributor.authorMuñoz-Rivera, Norida Fernandaspa
dc.contributor.authorMoreno-Pino, María Catalinaspa
dc.coverage.spatialSudamérica, Colombia, Rionegro, Antioquiaes_ES
dc.date2019-07-26-
dc.date.accessioned2021-05-24T19:17:01Z-
dc.date.available2021-05-24T19:17:01Z-
dc.date.issued2021-05-21-
dc.identifier.urihttps://repositorio.uco.edu.co/handle/20.500.13064/869-
dc.description.abstractEl objetivo principal de este artículo es analizar el estado actual de la integración a los proyectos de construcción basados en Project Management Institute - PMI y la filosofía Lean Construction (Construcción sin pérdidas); este artículo pretende difundir la evolución y aplicaciones de la nueva filosofía de gestión en la construcción, identificando las pérdidas del proceso productivo, analizando el ciclo de vida de un proyecto y aumentado mejoramiento de su desempeño. Se realizado un recorrido histórico desde las miradas de los autores que abordaron el concepto de la filosofía Lean Construction y Project Management Institute – PMI, dando a conocer los aportes de la metodología a los proyectos de construcción. A partir de los resultados obtenidos se identificaron dos proyectos de construcción, con la finalidad de observar los componentes que se tiene en cuenta para enfrentar un nuevo proyecto, se trabajaron los siete procesos propios de la gestión de proyectos definidos en el PMBOK del Project Management Institute - PMI: Inicio, Definición, Diseño, Planificación, Ejecución- Control, Operación y Cierre del Proyecto, el cual permitió identificar las causas que se presentan a la hora de gestionar los proyectos y permitiendo realizar una intervención concreta de mejora a la gestión por medio de una adaptación a los lineamientos del PMI y Lean. El presente artículo muestra que se puede integrar las dos metodologías (PMBOK – Lean) en el ciclo de vida de proyecto, buscando así una intervención concreta de la identificación de pérdidas y mejora a la gestión de proyectos. Por lo tanto, al concatenar estos lineamientos se podría afirmar podría realizar un diseño de modelo de gestión integral para que las organizaciones generen valor a las partes interesadas y fortalecimiento su planificación.spa
dc.format.extent32es_ES
dc.format.mimetypeapplication/pdfspa
dc.language.isospaes_ES
dc.rightsinfo:eu-repo/semantics/openAccessspa
dc.rights.urihttp://creativecommons.org/licenses/by-nc-sa/2.5/co/spa
dc.subjectConstrucciónes_ES
dc.subjectLean Manufacturinges_ES
dc.subjectProyectoses_ES
dc.titleEstado actual de la integración a los proyectos de construcción, de lineamiento de PMI y LEAN constructionspa
dc.typeMaster thesisspa
dc.description.abstractenglishThe main objective of this article is to analyze the current state of integration to construction projects based on Project Management Institute - PMI and the Lean Construction philosophy (Construction without losses); This article aims to disseminate the evolution and applications of the new construction management philosophy, identifying losses in the production process, analyzing the life cycle of a project and increasing performance improvement. A historical tour was made from the perspectives of the authors who approached the concept of the Lean Construction philosophy and Project Management Institute - PMI, making known the contributions of the methodology to construction projects. From the results obtained, two construction projects were identified, in order to observe the components that are taken into account to face a new project, the seven processes of project management defined in the PMBOK of the Project Management Institute were worked on. - PMI: Start, Definition, Design, Planning, Execution-Control, Operation and Closing of the Project, which allowed identifying the causes that arise when managing projects and allowing a specific intervention to improve management through of an adaptation to the PMI and Lean guidelines. This article shows that the two methodologies (PMBOK - Lean) can be integrated into the project life cycle, thus seeking a specific intervention to identify losses and improve project management. Therefore, by concatenating these guidelines, it could be affirmed that a comprehensive management model design could be carried out so that organizations generate value to interested parties and strengthen their planning.eng
dc.subject.subjectenglishConstructiones_ES
dc.subject.subjectenglishLean Manufacturinges_ES
dc.subject.subjectenglishProjectses_ES
dc.subject.lembConstrucciónes_ES
dc.subject.lembIngeniería civiles_ES
dc.subject.lembEmpresas constructorases_ES
dc.subject.lembConstrucción - Industria y Comercioes_ES
dc.subject.lembIndustria de la construcciónes_ES
dc.type.hasversioninfo:eu-repo/semantics/acceptedVersionspa
dc.audienceEspecialización en Alta gerencia para Sistemas Integrados de Gestiónspa
dc.rights.accessrightsOpen Accessspa
dc.rights.spaAcceso abiertoes_ES
dc.rights.ccAtribución-NoComercial-CompartirIgual 2.5 Colombiaspa
dc.publisher.departmentIngenieriaes_ES
dc.publisher.programEspecialización en Alta Gerencia para Sistemas Integrados de Gestiónes_ES
dc.description.cityRionegrospa
dc.contributor.corpauthorUniversidad Católica de Oriente. Facultad de ingenieríaspa
dc.identifier.bibliographicCitationMuñoz Rivera, Norida Fernanda; Moreno Pino, Maria Catalina. Estado actual de la integración a los proyectos de construcción, de lineamiento de PMI y LEAN construction (Tesis) Rionegro, Antioquia: Universidad Católica de Oriente; 2019. 32p.es_ES
dc.type.driverinfo:eu-repo/semantics/masterThesisspa
dc.type.coarhttp://purl.org/coar/resource_type/c_bdccspa
dc.type.redcolhttps://purl.org/redcol/resource_type/TMspa
dc.type.localTesis/Trabajo de grado - Monografía - Maestríaspa
Appears in Collections:Especialización en Alta gerencia para Sistemas Integrados de Gestión

Files in This Item:
File Description SizeFormat 
ESTADO ACTUAL DE LA INTEGRACIÓN A LOS PROYECTOS DE CONSTRUCCIÓN DE LINEAMIENTO DE PMI Y LEAN CONSTRUCTION.pdfESTADO ACTUAL DE LA INTEGRACIÓN A LOS PROYECTOS DE CONSTRUCCIÓN, DE LINEAMIENTO DE PMI Y LEAN CONSTRUCTION.1.05 MBAdobe PDFThumbnail
View/Open
Autorización.pdf
  Until 2050-12-31
Autorización162.88 kBAdobe PDFView/Open Request a copy


This item is licensed under a Creative Commons License Creative Commons